Building

Four-storey A-energy class apartment building

Pargi tn 52a features 16 apartments, an elevator, water underfloor heating, and heat recovery ventilation.

Heating, ventilation and elevator

A-energy classSolar panels are planned for the roof.
HeatingJõhvi district heating and individually adjustable water underfloor heating.
VentilationHeat recovery ventilation.
Elevator and entranceElevator to all residential floors and step-free entrance.

Balconies, parking and storage

Balcony or terraceEach apartment has a balcony or terrace.
ParkingA total of 20 parking spaces on the property. EV charging readiness.
Storage and bicycle houseSome apartments feature a separate storage room, the location and size of which are shown on the floor plan. In addition, a bicycle house with four lockable compartments will be built in the courtyard. Residents of the four apartments on each floor share one compartment for storing bicycles and larger items.
CourtyardThe landscaped courtyard features a children’s playground and seating areas.

Project

By the city park

Linnapargi Kodud is being developed by Jõhvi city park, with park greenery and town centre conveniences close by. Architecture was designed by Luhse & Tuhal. The 4-storey building features expansive windows, balconies, and a landscaped courtyard. A-energy class, water underfloor heating, and heat recovery ventilation support efficient living. Floor plans, location, and engineering form an integrated whole.

Common areas

Staircase

View gallery
View from Pargi tn 52a balcony towards the park

Visualisation is illustrative and may differ in details from the final development.

Linnapargi Kodud team

DeveloperPargi 52 OÜ
ArchitectureLuhse & Tuhal
General contractorRand & Tuulberg
SalesRealton Kinnisvara
Landscape architectureSulev Nurme
Interior designKrislyn Kokk

Construction progress

Construction info

Construction of Linnapargi Kodud begins in September 2026. Here are the key milestones from groundbreaking to home completion.

September 2026

Start of construction

Excavation and groundworks commence.

Autumn 2026

Foundations and utilities

Building foundations, plinth and main utility connections serving the building are constructed.

Winter 2026 / spring 2027

Load-bearing structures and roof

The building rises floor by floor, completing load-bearing structures, intermediate slabs, and roofing.

Spring / summer 2027

Facade, building services and interior finishes

Windows and exterior doors are installed, facade is completed, and MEP systems and interior finishing works proceed.

Summer / autumn 2027

Courtyard and handover

Parking, pedestrian areas and landscaping are completed, followed by final inspections, occupancy permit procedures, and handover preparations.

Stage timelines are planned and may be adjusted during construction.

Technical description

Structures and facade

According to the project, external walls are made of reinforced concrete-filled hollow blocks. Inter-apartment walls are reinforced concrete or concrete-filled blocks, and floors are precast hollow-core slabs. Non-bearing interior walls are gypsum boards on metal stud frames with mineral wool. Floor construction incorporates impact sound insulation. The facade is finished with plaster and brick slip tiles; the roof is an insulated flat roof.

Windows, doors and balconies

Apartments feature triple-glazed PVC windows and security doors. Balconies have glass railings designed to allow subsequent glazing.

Heating, ventilation and electricity

Jõhvi district heating, water underfloor heating, heat recovery ventilation, smart remote electricity metering, and solar panels for common building power.

Elevator, accessibility and security

The elevator serves all residential floors. Building entrance is step-free. Footpaths and plazas within the plot are designed with gentle slopes. Exterior door has electric locking.